Cub Cadet 945 SWE Two-Stage Snow Thrower Manual del operador Pagina 22

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 32
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 21
Belt Replacement
Belt Removal Preparation
Remove the cotter pin which secures the upper chute 1.
crank to the lower chute crank. Refer to Figure 7-1.
Remove the plastic belt cover on the front of the engine 2.
by removing the three self-tapping screws. See Fig. 7-2.
Loosen the bolt shown in Fig. 7-3 securing the belt 3.
keeper bracket and remove the other bolt. Push the belt
keeper bracket up off the engine pulley. See Fig. 7-3.
Auger Belt Replacement
To remove and replace your snow thrower’s auger belt,
proceed as follows:
Remove the bow tie clip and flat washer from the 1.
ferrule in order to disconnect the auger idler rod from
the brake bracket assembly. See Fig. 7-4.
NOTE: Make sure to maintain the location of the
ferrule on the idler rod.
Slip the auger control belt (the front belt) off the engine 2.
pulley.
Figure 7-4
Figure 7-1
Figure 7-2
Figure 7-3
Loosen
Remove
Service
7
22
Vista de pagina 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 31 32

Comentarios a estos manuales

Sin comentarios