Cub Cadet 528 SWE Manual del operador Pagina 8

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 7
Finish securing chute control assembly to chute support 3.
bracket with wing nut and hex screw removed earlier.
See See Fig. 3-4.
Check that all cables are properly routed through the cable 4.
guide on top of the engine. See Fig. 3-5.
Figure 3-4
Set-Up
Shear Pins
A pair of replacement auger shear pins and bow tie cotter pins
are included with your snow thrower. Store them in your snow
thrower’s dash panel until needed. See Fig. 3-5.
Chute Clean-Out Tool
The chute clean-out tool is fastened to the top of the auger
housing with a mounting clip and a cable tie at the factory. Cut
the cable tie before operating the snow thrower. See Fig. 3-7.
Figure 3-6
Chute Clean-out Tool
Figure 3-7
Figure 3-5
8 se c t i O n 3— as s e M b l y & se t -up
Vista de pagina 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 23 24

Comentarios a estos manuales

Sin comentarios